Structural Report
Project: Residential – City
When contemplating renovations, at what point can a building’s existing structure be considered no longer viable to repair and better off being completely replaced?
In this project, consideration was given to termite damage, water damage, poor initial construction and age related deterioration and faults.
Complete renewal and replacement of the main structure was considered to be the most cost effective solution.
Structural Certification / Assessment
Project: Commercial - Western Sydney
The procedure for assembling the structural steel frames to the façade support structures to this project required certification for safety reasons.
Siga’s role was to check and certify the proposed assembly procedure.
CHLOE'S JOKE
Q –Why did the students eat their homework?
A – Because the teacher said it was a piece of cake!
Chloe Simone –15 years old – hopes you enjoy this joke!